Size: Customized,OEM
Toerance:±0.01mm
Material:Stainless steel,Carbon steel, Brass,Bronze,Iron,Aluminum.
Surface treatment:Heat treatment,polishing,PVD/CVD coating,Galvanized,Electroplating,spraying
and painting and other chemical handings.
Processing equipment: CNC machining center, CNC lathe, grinding machine, automatic lathe machine,conventional lathe machine, milling machine,drilling machine,EDM,wire-cutting machine,and CNC bending machine
Processing method: CNC machining,Turning,Milling,drilling, grinding,broaching,welding and assembly.
Application:Car, medical, carrrier,ship,excavator, Automation machine,medical device, industrial machine,automobile, and electric appliance etc.
Drawing format: PRO/E,CAD,Solid works,IGS,UG,CAM,CAE
Service:According to customer requirements, provides production design,production and technical service,mold development,and processing to offer one-stop service.
Delivery time:7-30 days
Packing: EPE foam/Rust proof paper/Stretch film/Plastic bag+carton
MOQ:Negotiable
Q1: Are you a trading company or a factory ?
A1: We are a manufacturer specializing in high-precision metal cutting parts processing, stamping and other hardware.
Q2: Do you accept to manufacture the customized products based on our design?
A2: Yes, we are a professional factory with an experienced engineering team, would like to provide the OEM service.
Q3: How can I get the quotation?
A3: We will offer you the quotation within 24 working hours after receiving your detailed information. In order to quote you faster and more accurate, please provide us the following information together with your inquiry:
1) CAD or 3D Drawings
2) Tolerance.
3) Material requirement
4) Surface treatment
5) Quantity (per order/per month/annual)
6) Any special demands or requirements, such as packing, labels, delivery,etc.
Q4: Will my drawings be safe after sending to you?
A4: Sure, we will keep them well and not release to others without your permission.
Q5: How long is the lead-time for a mold and plastic parts, machining parts, sheet metal fabrication?
A5: It all depends on the mold (parts) size and complexity.
Normally, the lead time is 18-20 days for molds, 15-20 days for plastic parts. If the molds are very simple and not big, we can work out within 15 days.
The lead time for machining parts is around 2-4 weeks.
For sheet metal fabrication the lead time is around 3-5 weeks.
Copyright © Shanghai Shangmeng Mechanical & Electronic Equipment Co.,Ltd. All Rights Reserved - Privacy policy